Note for the quotation报价说明
The above quotation is FOB price in China
以上报价是中国境内的FOB价;
The quarry exploration, geological survey, civil works (from mine crushing to packing workshop of finished products) is not included in the quotation;
采石场勘探、地质勘查、土建(从矿山破碎到成品包装车间)不含在此报价中;
Nonstandard is the discharge pipe and gas pipe between equipments;
非标是指卸料管道以及设备之间的空气管道
Erection cost does not include the oxygen、acetylene, such gas shall be bought by buyer and transported to the erection site;
安装费用不包括氧气,乙炔,这些气体都由买方供应并输送至安装现场。
Erection cost does not include the crane cost, the visa extension cost for the erection worker during erection procedure, the crane for erection shall be rent or bought by the buyer, the buyer shall responsible for work permit visa extension of the erection worker;
安装费用不包括吊车费用,在安装期间内安装工人的签证延期费用,安装吊车应由业主租赁,买方应负责安装工人的工作许可签证。
The technical service cost exclude the extension fee for working permit visa, the work permit visa extension fee of the technical service person shall be responsible by the buyer.
技术服务费用不包括工作许可签证的延期,技术人员的工作许可应由业主负责
Various kinds of fee charged by local government for the seller’s employee shall be responsible by buyer;
由当地政府所要求的各项费用应由买方负责
Various lubricants, grease and any other things which is not permitted to export shall be responsible by buyer.
各类油脂,润滑油以及其他等不能出口的,由业主负责。
序号NO. | 项目名称item name | PRICE(US$) |
1 | A设备和材料供货及安装A Equipment and Material Supply and Installation | |
1.1 | 机械设备供货Supply of machinery and equipment | |
1.2 | 电气及自动化设备供货Supply of Electrical and Automation Equipment | |
1.3 | 给排水设备供货Supply of water supply and drainage equipment | |
1.4 | 暖动设备供货Supply of heating equipment | |
1.5 | 非标设备、非标准件、钢结构、网架及其他材料供货Supply of non-standard equipment, non-standard parts, steel structures, grids and other materials | |
设备和材料供货合计Total supply of equipment and materials | ||
3 | 安装工程费用(含现场制作部分)Installation costs (including site production) | |
3.2 | 电气和自动化安装Electrical and automatic installation | |
3.3 | 给排水设备安装Installation of water supply and drainage equipment | |
3.4 | 暖动设备安装Heating Equipment Installation | |
3.5 | 筑炉工程Furnace Construction Project | |
3.6 | 保温工程Furnace Construction Project | |
3.7 | 非标准件制作Manufacturing of Non-standard Parts | |
3.8 | 非标设备制作Production of non-standard equipment | |
安装工程费用合计Total Installation Cost | ||
B 其他费用B. Other costs | ||
1 | 设计及技术服务费Design and technical service costs | |
2 | 总承包管理费General Contracting Management Cost | |
3 | 施工安全措施费Cost of construction safety measures | |
4 | 临时设施费Temporary facility costs | |
5 | 人员调遣路费Expenses for the Redeployment of Personnel | |
6 | 试生产调试费Commissioning cost of trial production | |
7 | 建筑及安装工程一切险All insurance for construction and installation works | |
B:其他费用合计 B: Total other expenses | ||
总承包价格合计(A+B) Total Contract Price (A+B) |